Business bills (C1–C7) are harder than household bills: their grid tariffs
carry a price per kW of peak demand, and many operators file business products
in separate documents. About half are within ±5 % today, with a median miss of
4 to 5 %, against 71 % and 2.2 % for households. Check a business bill’s own
elcom_check before relying on it (business bills).What a miss means
A bill can miss ElCom’s figure for reasons that are not an error in the data. ElCom’s figure is for its standard customer, on the operator’s standard product; an operator with several household products or a dynamic tariff can be billed correctly and still differ. A miss is a place to look, not a verdict.Operators whose fee differs by municipality
ElCom’s figure for an operator is an average over the municipalities it supplies, and within one operator only the community fee differs between them: Romande Energie’s 262 municipalities range from 27.3 to 29.8 Rp/kWh for H4. Where the operator’s sheet states the fee per municipality, the bill can be exact for each, so the measurement prices every municipality ElCom has a figure for and compares the one with the median miss against ElCom’s figure for that municipality. Not the best match, which would flatter the result: the typical one. Where the sheet has one fee for the whole area, the operator’s average stays the reference. To get an exact bill for one municipality, pass its BFS number asbfs to
/api/bundle.
When a bill misses, the measurement names the part that misses most: energy,
grid usage, metering, community fees, the national charges, last year’s prices
still on file, or a part with no price at all. Those causes drive what the
collector does next; they are not part of the public response.
What the measurement is not
It is not independent everywhere
It is not independent everywhere
ElCom’s household figure (H4) is also what some corrections are learned
from: which product is an operator’s standard one, which grid tariff a
household is on, whether a grid price already contains the national
charges. For those operators H4 is no longer an independent check. H2 never
feeds any learning, so it is the cleaner test.
A stand-in is never counted as a match
A stand-in is never counted as a match
Where an operator has published no tariffs at all, the bill falls back to
ElCom’s own figures, marked as such. Those bills are excluded: a figure
compared with itself proves nothing.
It covers what ElCom publishes
It covers what ElCom publishes
ElCom publishes standard categories, not every product. A dynamic tariff, a
heat-pump product or a business on a negotiated contract is not measured.
How far one bill can be trusted
Every composed bill (/api/bundle) carries a confidence block: the
strongest evidence behind that bill, so you can use the strong ones directly
and treat the rest with care.
source is where the lines came from, whatever ElCom says about them.
estimated_parts names parts the sheet left empty and ElCom’s figure filled
(the meter, the community fee), and a dynamic price estimated from its
published quarter-hour prices (energy (dynamic)). Such a line carries
dynamic_estimate, with the period, the number of prices and the method: the
mean over the last year, once a week or more is on file. elcom_check is the latest nightly check in
the ElCom category nearest your consumption. It applies only to the bill as
the database opens it, within 25 % of that category’s consumption. Once you
choose another product or tariff, applies is false and why_not says why.